Projects 2008 This year we made the first attempts at exploring the Pozo Azul cave system in the north west of Spain. A demanding cave because of the 700 meter underwater cave were all gear has to be transported through. Also demanding because of the dry parts and the waterfall between the two sumps. Read more by clicking the buttons for full project reports.